WK17C: Concrete Phase Complete

This was a crazy but satisfying week. We began by pouring our final masonry lift, and finished up the week with a shiny new structural slab. I went by the site this afternoon and was happy to see that there are no visible signs of cracking. The clean-up crew that was on site today sprayed the slab with water before they left to ensure that as the concrete cures it has enough extra moisture. The water you see here was sprayed on at around 3pm. It will all be gone by the 6pm tonight- either through evaporation, or by being sucked into the concrete.