Saturday, September 29, 2007

WK22: Great Views!

The view from the upstairs balcony. On a clear day you'll be able to see all the way to Mt. Baldy- over 60 miles away!
Me, confirming some dimensions with Angel from York Construction.

Friday, September 21, 2007

One more for the weekend.

I took this image this morning. The "flip-flop" facade is taking shape. More next week.

W21C: Where we are

This week finished out the first floor phase of framing. We are now going to start on what is technically our third floor and should be done by October. Have a great weekend!

Tuesday, September 18, 2007

WK18C-20C Framing Continues

Things have been moving very fast over a the site and we're in the process of shealthing the last deck today (stay tuned for pics by the weekend). I haven't had time to update the blog much since I've been either on site or in the classroom teaching. However, the framing work on site has been professionally handled by the guys at York Construction who have been working at a blistering pace.
I'll let the photos speak for themselves.

That's about we're we left off on Friday. You can see that the 2nd floor floor joists are in and the building form is beginning to take shape.


A view from the lower floor bedroom. The window is designed to maximize the view to the east while clipping out the Freeway below.Angel, the foreman from York Construction laying out the first floor decking.

Since theres not much room to work on the Hillside the framers access the outside edge of the building using outriggers. If you look you can see the first angled cantalever taking shape.

Each week starts with a lumber drop. As you can see, it's pretty self-explanatory. The "boom" it makes sounds like a bomb going off.